Installation:
① It is installed at the plane node formed by supports and hangers.
② Place the spring nut according to the size of the connector.
③ Fix it with hexagon bolt and screw it to the specified value.
Product number | Surface treatment | W/100 | Packing | ||||
EG | HG | SS | |||||
F1026 | • | • | • | 17 | 25 |
Design load data for standard U-groove connections
The calculation is based on the bolt and nut of M12, and the torque is equal to 65 nm.
Installation:
① It is installed at the plane node formed by supports and hangers.
② Place the spring nut according to the size of the connector.
③ Fix it with hexagon bolt and screw it to the specified value.
Copyright © 2020 U Channel Advanced Materials Technology (Shanghai) Co., Ltd