Welcome U Channel  Advanced Materials Technology (Shanghai) Co., Ltd

Home/News/Company News

zhongjiao Project Department of the installation company: the use of finished supports was affirmed by zhongjiao group

Publisher:上海优槽 Date of issue:2020-11-22 Views:909

"The process, installation quality and appearance of the finished bracket are obviously different from those of the traditional bracket, and the difference is obvious..." zhongjiao project has been widely praised for its promotion and use of finished supports.


In order to actively respond to the call of the Bureau and the company, the zhongjiao Project Department of the southern branch of the installation company took the lead in using the finished product support on the first floor of the headquarters building of zhongjiao. The finished bracket is different from the traditional bracket in processing, manufacturing and installation. The traditional bracket is made of angle steel by cutting and welding. Once it is formed, it is inconvenient to adjust the pipeline elevation unless cutting and welding is carried out again. The finished support is a supporting structure composed of channel steel, tube bundle and accessories according to the design style, which can be carried out according to the site installation conditions Flexible up and down. The channel steel, tube bundle and accessories of the finished support system adopted in the project are all mass produced in the factory. When leaving the factory, a layer of galvanized material with uniform thickness is coated on the outside, so that the finished support can adapt to different external environment requirements. During the installation process, there is no need to weld and drill on site, only cutting, cutting and on-site installation are needed. During the whole installation process, all the connectors and channel steel can realize the rigid matching of assembled components, no displacement, accurate positioning and elegant appearance.


The use of the finished support reduces the welding link, improves the working efficiency of the workers to a certain extent, reduces the labor cost, and avoids the waste of the bracket caused by the design scheme change and line adjustment, which is highly affirmed by zhongjiao.


201396105259780.jpg